Construction Return to Work Plan - Level 3

Construction operators need to be aware of health and safety responsibilities to ensure compliance is met and workers and others on site are kept safe. Our team has created a return to work plan for those in the construction sector to ensure  Level 3, 2 and 1 health and safety is being managed correctly and businesses can provide evidence of their efforts.

Suitable for:

  • Builder
  • Electrician
  • Plumber, Gasfitter, Drainlayer
  • Landscaper
  • Concreting
  • Bricklayer, Tiler
  • Kitchen Installer
  • Flooring
  • Construction site cleaner
  • Roofer
  • Aluminium Installer
  • Painter / Plaster
  • + more

Return to work plan includes:

  • Sign In/ Out Register

  • Contractors Control Plan  

  • Builder/Client/ Homeowner Control Plan

  • Client/Homeowner Declaration

  • Daily Site Checklist

  • Emergency Site Shutdown Checklist

  • Toolbox Talk (Bullet points)

  • JSA  Requirements for worksites  in Level  1, 2 & 3 - this will  be completed  and hopefully cover most areas, updates during level changes may be required.

  • Hazard Risk Register Update

  • Emergency Protocols
  • Re-Induction to Site for workers
  • Worker Health Information

Documents are provided via Google Drive ready for download and implementation. Hard copies to be distributed during level 3. 

Options include: Basis plan (as above), JSA Only



⛟ Delivered to your door fast in NZ for $8.50 + GST
📦 Free Delivery on orders over $150 + GST
🛍 Safe Secure Online Shopping
☏ The Best Customer Service
Ask a Question